For so many years in my business, customers who built their own houses almost always ask us how much the total cost of building this house is. build a house. What is your price per square meter? In fact, the client just wants to know whether his budget is enough, but this question is very complicated for us to answer, and there is a lot of information to know. Let’s talk about the cost of the whole process of building a self-built house.
Table of Contents
The whole process cost of a self-built house includes:
The cost of the whole process is marked on the map: architectural design, building construction, interior design, interior construction, soft furnishings
-
Architectural design costs:
charge according to your design requirements and the difficulty of the design. At present, the proportion is generally very low. However, we strongly recommend that more budgets allocate to allow designers to participate in the construction of the building to guide the construction, control the effect, and save Construction costs.
-
Building construction:
from the demolition of old houses to the level of rough houses, including old house demolition, old house demolition, foundation treatment, foundation, main structure, water and electricity pre-embedding, exterior wall decoration, interior wall plastering, door and window engineering, Roofing engineering, outdoor engineering. Building construction accounts for the highest proportion of the total cost and is also the most important cost to control. It recommends that the subsequent cost can control in the form of a total cost lump-sum to reduce the increase in cost.
-
Interior design cost:
This depends on your needs, it can configure in general or luxuriously decorated, but the interior design cost recommends to plan.
-
Indoor construction cost:
same as building construction, it recommends buying it at a price.
-
Soft decoration and furniture costs:
At present, most of these purchase by the owners themselves. If you have high requirements for the interior, it recommends asking the designer to make a proposal and purchase it by yourself.
-
Control the construction process cost:
ensure that the cost during the process does not exceed the budget as much as possible, but it is almost impossible for the construction cost to not exceed the budget. Therefore, it recommends using 10% of the overall cost as an excess reserve fee. At the same time, the contract must be bound to ensure that the contract does not exceed. The price does not exceed the price, and the owner himself tries to change the plan as little as possible because the construction party must ask for additional money for a change, so it is very important for the owner to consider the plan and details in advance to control the construction budget.
Speaking of the cost of the whole process, you just know that the whole process has these costs,
how much is the cost of each stage to build a house?
-
Architectural design fee to build a house:
depending on the difficulty of the project, your requirements, and the professional level of the designer, a more formal quotation for customized projects: a total price of 10,000.
-
Building construction costs build a house:
You can follow the “Inquiry Price” of the WeChat service account [Craftsman’s Home Building] to obtain an estimate on your own.
-
Interior design cost:
also look at the difficulty, the requirements, and the degree of professionalism. The more formal quotation for customized projects: the unit price is 50-200 yuan/square.
-
Indoor construction costs to build a house:
You can follow the “Inquiry Price” of the WeChat service account [Craftsman’s House] to obtain an estimate on your own.
-
Costs of soft decoration and furniture:
you can follow the “Inquiry” of the WeChat service account [Artisan House] to obtain an estimate on your own.
Let me talk about how to use the valuation system below:
First, the valuation system enters my house building information according to the requirements. And chooses the package or independent choice according to personal needs. Here I choose the package C package accommodation type. The system divides the house construction into basic items and recommended items according to my house construction needs information. There are three types of options.
Three types of options to build a house
- Basic items: Contains the foundation type and main structure type of the house. According to the local soil quality, climate, and other comprehensive factors, determine which type of foundation to use. Generally, strip foundations can meet the demand. Poor soil areas may require piling Or box foundation. The basic items usually account for about 70% of the construction fund of the house;
- Suggested items: Suggested configuration to improve the functionality of the house, including water and electricity installation, plastering and waterproofing of walls, waterproofing of roofs, tiles, doors and windows. , The price accounts for about 15%-20% of the construction fund;
- Optional: Some simple decorations, such as floor tiles, ceiling decorations, kitchen utensils, bathroom and bathroom, and other common brand simple decorations, can basically meet the hardware needs of the family living, which roughly accounts for the construction funds of the house. Around 10-15%;
If the requirements for structure and decoration are relatively high. You can also use the self-selection mode of the valuation system. You can freely choose various types of structures and brands of different grades of hard and soft decoration that you like. So as to provide reasonable Capital planning.
To sum up: (estimated design cost + house construction cost) * 110% = house construction budget . There is nothing trivial about building a house, the funds planns well. And the thing is half done, and the rest is to find a good professional supplier. I hope you can build your favorite home in the new year